Our first mud kitchen for a nursery school. Since when we have made a few more with varying designs based on availability of different pallet
Our prototype wellie stand for Fryern School, the first of an order for six.
This was an early project to produce a shelter next to the pond at Hiltingbury school.
Another school project for a Christmas Fayre. Can you get the ball into the snowman!
This was our very first project to produce a play train for a local school. Our first test in recycling pallets
This was a major project to produce six planters of various sizes (two are shown in the picture) plus two mud kitchens, and a table with benches.
Some examples of previous renovations we have undertaken.
From left to right, top is before renovation, below is after:
Ramally Cemetery bench
Pub wooden pin-ball machine
Bathroom cabinet from original QM (now in Seacity after renovation)